Your Delivery Timeline at a Glance

Every TICC order moves through four sequential phases. The total is shown at checkout before you confirm payment.

🔨
Step 1
Production
PT
Per product page
📦
Step 2
Dispatch Prep
1–2
business days
✈️
Step 3
DHL Transit
3–7
business days
🛃
Step 4
Customs
1–7+
business days
📋
The total estimated delivery timeframe is displayed at checkout before you confirm payment — combining all four phases into a single window.
1

Production Time (Made-to-Order)

All TICC products are made to order. Production does not begin until after successful payment confirmation. The exact production time for each product is displayed clearly on its individual product page — look for the Production Time (PT) label.

Production time varies depending on:
Product type & craft technique
Craft complexity & finishing time
Material availability at the cluster
Quantity of samples ordered
💡
A simple textile sample may have a shorter production time. Handcrafted wood, metal, or hand-knotted products may require longer finishing time. Check the product page for the specific PT before ordering.
2

Dispatch Preparation

Once production is completed, a short dispatch preparation stage takes place before the package leaves India. This typically takes 1–2 business days after production sign-off.

What happens during dispatch preparation:
Final quality check is conducted on every item
Export documentation is prepared (invoice, packing list, COO)
Shipment is packed securely for international transit
DHL pickup is scheduled and confirmed
3

DHL International Transit

After dispatch, DHL Express handles international transport from India to your destination. Once the shipment is collected, DHL tracking becomes active and you can monitor progress in real time.

3–7
business days
Transit duration depends on:
·Destination country and regional DHL hub routing
·Seasonal shipment volume (peak periods may add 1–2 days)
·Local last-mile delivery conditions
📍
DHL tracking is activated as soon as the shipment is collected from our dispatch point. You will receive a tracking number via your registered account and email.
4

Customs Clearance

Customs clearance is handled by the destination country's customs authority — not by TICC or DHL. Processing time varies significantly by country, order content, and documentation status.

Typical customs clearance timelines:
1–3
Business Days
Minor clearance — routine import, all documents in order
3–7
Business Days
Documentation review — authority requests additional paperwork
7+
Business Days
Physical inspection — rare; outside TICC's or DHL's control
✓ Duties Prepaid at Checkout
Clearance is generally smoother — no hold at customs waiting for duty payment.
⚠ Duties Payable on Arrival
Final delivery depends on prompt payment completion to DHL at destination.

How Your Total Delivery Time Is Calculated

All four phases are added together to produce the total estimated delivery window shown at checkout.

Total Delivery Time Formula
PT
Production time
(per product page)
+
1–2
days dispatch
preparation
+
3–7
days DHL
transit
+
Customs
1–7+ days
(variable)
=
Your Total
Shown at checkout
before payment
📊 Example Scenario Product with 5–7 business day production time
Production
5–7
business days
Dispatch
1–2
business days
DHL Transit
3–7
business days
Customs
Variable
typically 1–3 days
Estimated total (exc. exceptional customs delays): ≈ 9–16 business days

Important Notes

📅
Production starts after payment confirmation. The PT clock begins only once your payment is successfully processed — not at the time of order placement.
📦
Bulk orders follow separate timelines. Large-volume orders are handled through a coordinated production and logistics plan — contact us before placing to receive a bespoke timeline estimate.
🏖
Public holidays may extend timelines. Public holidays in India (production side) or your destination country (customs and last-mile delivery) are not counted as business days and can extend the overall window.
🌐
Global logistics disruptions may affect transit. Severe weather events, port congestion, or extraordinary geopolitical situations can occasionally delay DHL transit beyond the standard 3–7 day window.

What If I Need Faster Delivery?

If your sourcing requirements involve tighter delivery windows, contact us before placing your order. We will assess feasibility and confirm what is possible.

How to request expedited handling:
1
Contact us on WhatsApp or email before placing the order, with your required delivery date and product details.
2
We will confirm feasibility based on current artisan production schedules and DHL availability.
3
Note: not all products can be accelerated — handcrafted production cycles cannot always be compressed without compromising quality.
Our Transparency Commitment
We display production times on each product page so you can plan before adding to cart. We then show the full estimated delivery window at checkout — combining production, dispatch, and transit — before you confirm payment. There are no hidden timing assumptions in the TICC checkout process.

Summary

Your delivery timeline consists of:
1
Made-to-order production time (varies by product — check the product page)
2
Dispatch preparation (1–2 business days)
3
DHL international transit (3–7 business days, region dependent)
4
Destination customs clearance (1–7+ days, outside TICC's control)
→ The total estimated timeframe is shown at checkout before payment confirmation.
Was this article helpful?